View Single Post
  #8  
Old Posted Aug 31, 2009, 5:23 PM
dmuzika dmuzika is offline
Registered User
 
Join Date: Feb 2006
Posts: 423
Quote:
Originally Posted by 240glt View Post
Well these upgrades to hwy 97 are not being done due to high volumes on this highway either. The article states that they're doing it to help spur investment and to attract tourists to the area. Really the only bad things about that stretch of 97 are the slow drives through the towns and the logging & chip trucks. Aside for that it's not that busy a road.
I noticed they're only twinning Hwy 97 north of Cache Creek, what about Vancouver-Cache Creek? I know TCH 1 cannot be twinned due to terrain, otherwise it would have been twinned as opposed to the Coquihalla Hwy being constructed. I've also heard that Hwy 99 north of Whistler would be a massive project.
Reply With Quote