Quote:
Originally Posted by Dengler Avenue
$400M? With 101/59 pegged at $204M, at least MI can spend half of that finishing up 100/59, 100/Ste Anne’s and 100/St Mary’s.
|
I think the reconstruction of the section between St Mary's and 59 will be the most expensive and require the most structures, though I could be wrong. I wouldn't be surprised if it ended up being around 400 or 450 for that whole stretch