View Single Post
  #2566  
Old Posted Feb 18, 2019, 6:41 PM
jmecklenborg jmecklenborg is offline
Registered User
 
Join Date: Jul 2003
Posts: 3,165
Quote:
Originally Posted by Korey View Post

I wonder if this means whenever we throw the next big batch of funds (whether state or federal) at the project, if it goes to the San Gabriel tunnels before Pacheco? I don't doubt that Pacheco will get it's HSR, the political power structures in Silicon Valley/NorCal are too strong for it not to, but with upgraded Altamont service maybe the Bakersfield to LA connection becomes the next priority.

Yeah this is definitely a battle royale between San Jose being on the mainline -- and getting 12 trains per hour per direction - vs. the Altamont route, which at-best puts San Jose on a spur.

If HSR is rerouted via Altamont to a new Transbay tube from Oakland, the possibility exists for HSR spurs to both San Jose and to Palo Alto via a rebuilt Dumbarton Bridge. They could do a train split where two half-length trains, one originating in Palo Alto and another from San Jose join to form a full-length train in Fremont and then head downstate as a full double-length train.
Reply With Quote