Quote:
Originally Posted by Innsertnamehere
a Hamilton- Kitchener line could run up the CP corridor through Waterdown to Guelph then over to Kitchener.
The only pair in that triangle that doesn’t have a practical connection is Brantford-Kitchener.
|
Technically the CP Goderich Subd. and CP Hamilton Subd. aren't connected, so trains would need to reverse on the Galt Subd. to go from one to the other. I suppose a remedy wouldn't be that difficult though.