View Single Post
  #55  
Old Posted Jul 26, 2022, 1:14 PM
jamincan jamincan is offline
Registered User
 
Join Date: Jul 2020
Location: KW
Posts: 1,442
Quote:
Originally Posted by Innsertnamehere View Post
a Hamilton- Kitchener line could run up the CP corridor through Waterdown to Guelph then over to Kitchener.

The only pair in that triangle that doesn’t have a practical connection is Brantford-Kitchener.
Technically the CP Goderich Subd. and CP Hamilton Subd. aren't connected, so trains would need to reverse on the Galt Subd. to go from one to the other. I suppose a remedy wouldn't be that difficult though.
Reply With Quote