But the AMT said that they're not going ahead with the extension. Are there any other confirmed rail projects underway at the moment?
The AMT confirmed that they won't go ahead with the extension of Mont-Saint-Hilaire line to Saint-Hyacinthe. However, here is a list of AMT's main projetcs underway :

- Lachine maintenance centre (entering service in 2015);
- Pointe-Saint-Charles maintenance centre (entering service in 2017);
- Third track construction between Lucien-L'Allier and Montréal Ouest, allowing more trains on Vaudreuil line and trains from Saint-Jérôme line that terminate at Parc should then go all the way to Lucien-L'Allier (works should be finish by fall 2015);
- Third track construction at Mont-Saint-Hilaire station, allowing dwelling time without blocking the track for CN and VIA trains and potentially allowing more departures (works should be finished by year end iirc);
- Construction of Sauvé and Pointe-aux-Trembles stations on new Mascouche line (opening summer 2015);
- Construction of a new station (Du Canal) on Candiac line near canal Lachine (works should start this year);
- Works for improving safety inside Mont-Royal tunnel (ungoing works);

There are also other smaller construction sites across the network (at Saint-Constant, for example).