Found this here. 3.5Mb pdf, beware.
http://www.google.ca/url?url=http://...KkwwvKh_NmaKhQ
MMM Group has been hired by the Province to prepare a functional design report in anticipation of awarding a design-build contract for a new highway interchange at PTH 59 and PTH 101 and associated road improvements. Currently the project time line is as follows: June 2014 to June 2015 - Engage a design/build contract for the PTH 101/59N interchange and AT crossing. Fall 2014 – Complete concept for interchange and AT crossing. Summer/Fall 2014 – Opportunities for public input. June 2015 to June 2019 – Construction. June 2019 – Interchange and AT crossing open to the public. The options for the Active Transportation crossing still being reviewed are: two underpasses or ‘carriage-ways’, each approximately 40m in length, with an uncovered adjoining pathway 25m in length; a single covered crossing approximately 100 m in length; or, the crossing could be a shared tunnel for AT and vehicles with barrier protection of the AT portion. The AT crossing is anticipated to be rather straight, as it will follow Raleigh/Gateway. We will keep you posted when an present the preferred alternative. open house will be held Developing Manitoba’s Red River Corridor as a destination this Fall to present the preferred alternative.