^ Most of the exposed rail cut is already built over north of 41 St and will eventually be totally covered. The plan for Abzug Park is to cover over the other two open sections from 37 to 39 St's and as far as I know create an elevated bridge sort of thing across the Lincoln Tunnel plaza to 40 St, though I don't see that depicted in the PABT planning docs but that doesn't really mean anything.
__________________
Everything new is old again
Trumpism is the road to ruin
|