SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Never Built & Visionary Projects (https://skyscraperpage.com/forum/forumdisplay.php?f=342)
-   -   CHICAGO | Chicago Spire | 610 M / 2,000 FT | 150 FLOORS | NEVER BUILT (https://skyscraperpage.com/forum/showthread.php?t=153494)

UberAlles Jul 8, 2008 2:46 AM

Dalton, the project is not on hold. They will start doing a utility overhaul for the neighborhood. It needs the overhaul to support such a building. Rest!

The building will rise early 2009.
The hole is just larger than the elevator core at 115 feet. The building diameter is ~twice that at 218.

Steely Dan Jul 8, 2008 1:53 PM

many posts deleted.

as always, there will be no talk about the merits of the CTBUH's height measuring rules in this thread. if you guys want to have the 10 billionth bitchfest about that crap, do it somewhere else because i have no patience for it.

10101000 Jul 8, 2008 4:22 PM

Quote:

Originally Posted by UberAlles (Post 3659041)
Dalton, the project is not on hold. They will start doing a utility overhaul for the neighborhood. It needs the overhaul to support such a building. Rest!

The building will rise early 2009.
The hole is just larger than the elevator core at 115 feet. The building diameter is ~twice that at 218.

That is good to hear.

Kamatzu Jul 8, 2008 5:11 PM

This building looks great, like it belongs underwater in Atlantis somewhere, which makes it all the cooler that it's right beside the lake.

Some plumbers were over here a while back, and even they were talking about the Spire! The workers constructing this must be proud of what they're doing.

10023 Jul 8, 2008 6:32 PM

For an idea of how tall this thing will be, hop over to the Burj Dubai thread. It's at about 2,000 feet now, and damn it's big.

johnandahalf Jul 8, 2008 11:28 PM

Quote:

Originally Posted by UberAlles (Post 3659041)
The hole is just larger than the elevator core at 115 feet. The building diameter is ~twice that at 218.

Too bad we can't put THAT in the thread title. I'm amazed how often it's asked.:koko:

ô¿ô

SNT1 Jul 9, 2008 12:16 AM

Hard to believe it's been a year since we had that orgy of bananaculation when this supertall officially went U/C. A year!. Next thing you know, it's above ground already! Keep selling Shelbourne!

jcchii Jul 9, 2008 1:51 AM

there was some premature banaculation, but it passed

America 117 Jul 9, 2008 3:34 AM

that other thread was geting soooo looonng!:slob: :slob: :slob:
glad too have a new one!

gratenate Jul 9, 2008 4:04 AM

Quote:

Originally Posted by SNT1 (Post 3661035)
Hard to believe it's been a year since we had that orgy of bananaculation when this supertall officially went U/C. A year!. Next thing you know, it's above ground already! Keep selling Shelbourne!

:banana: :banana: :banana: :banana: :banana:

For old time's sake.

harryc Jul 10, 2008 12:28 AM

July 09 - afternoon
 
From above
http://lh6.ggpht.com/harry.r.carmich...JPG?imgmax=800


higer res
2007 series
2008 Q1 series
2008 Q2 series

Surveying the Secant wall ( W side )
http://lh4.ggpht.com/harry.r.carmich...JPG?imgmax=640 http://lh3.ggpht.com/harry.r.carmich...JPG?imgmax=640

Making a hole for the water to get out... This is in the slurry wall on the E side
http://lh4.ggpht.com/harry.r.carmich...JPG?imgmax=800

http://lh5.ggpht.com/harry.r.carmich...JPG?imgmax=800

The thing back at work doing whatever it does.
http://lh3.ggpht.com/harry.r.carmich...JPG?imgmax=720

Very quiet today
http://lh4.ggpht.com/harry.r.carmich...jpg?imgmax=800

http://lh4.ggpht.com/harry.r.carmich...JPG?imgmax=800

http://lh5.ggpht.com/harry.r.carmich...JPG?imgmax=800
Larger

treras93 Jul 10, 2008 1:06 AM

Nice shots Harry! thanks

have they started the parking structure or are they still doing the foundation?

Dalton Jul 10, 2008 2:03 AM

Quote:

Originally Posted by treras93 (Post 3663539)
Nice shots Harry! thanks

have they started the parking structure or are they still doing the foundation?


It appears that Case has completed or very nearly completed their contract, which it seems was limited to caissons, the ramps to/from LSD, and the bathtub surrounding the site (slurry and secant walls). I would think that the mat pour would be next, but Shelbourne has not announced signing anyone to continue the work as of yet. Perhaps someone with knowledge of the process can comment on whether the mat is a solid reinforced concrete block or whether there needs to be utilities run from off-site through the mat first, which would greatly complicate (and delay) matters.

Anyway, this seeming inactivity is slightly worrying me. Was Kelleher's original game plan to start foundation construction to show he was serious and generate sufficient sales to then secure loans before continuing? He is a risk-taker, for sure. But how much of his own net worth is he willing to tie up in this project?

UberAlles Jul 10, 2008 2:30 AM

Repost of BVictor's.

Quote:

Next steps will take a few months - but you won't see much going on. CASE should wrap up in about 4-weeks.
Then the entire neighborhood will be getting a utility upgrade - and all the wiring, etc has to be done.
Second, work at the bottom of the cofferdam for utilities and elevator shafts. Nothing sexy for a while.
I think that would mean that the mat has to wait until the work at the bottom is done. Then again....???

As far as the inactivity goes. It might have been hard to do the utilities while CASE was still working. I guess it was better to wait until CASE moved out so they wouldn't get in each others way.
Though as far as getting in each others way goes. I never really saw any of it whle working. Seemed the iron workers, carpenters, surveyers and concrete people always worked pretty well together. Once floors started going up we all got in a rhythm. Of course, I'm sure the superentendant must get complaints all the time. Are there any horror stories out there?

Pru Jul 10, 2008 6:43 AM

Quote:

Originally Posted by Dalton (Post 3663649)
. . . or whether there needs to be utilities run from off-site through the mat first, which would greatly complicate (and delay) matters.

Just a minor clarifying point: With regard to "delaying matters" -- if it's part of the project plan it's of course not a "delay" in the sense of falling behind schedule since that's what's supposed to be happening at that point in the schedule.

-- But of course it does delay our "going-vertical" banaculation.

Dr. Taco Jul 10, 2008 12:58 PM

Comed has been doing behind-the-scenes (duh) and should be making their way in very soon

neverdone Jul 11, 2008 10:02 AM

The transformers boxes ( I believe that is what they are) under lake shore drive on the western side had been utilized by the nearby townhomes, but they installed new ones. I don't know if the service has been switched though.

Will the parking garage extend underneath the parking ramps?

Capsule F Jul 11, 2008 3:52 PM

Wow only 117 replies on this project. Chicagoans must not be very excited about it.




Jk.

MrLakepoint Jul 11, 2008 4:47 PM

Quote:

Originally Posted by Capsule F (Post 3667096)
Wow only 117 replies on this project. Chicagoans must not be very excited about it.




Jk.


NOT EXCITED....:haha:

Take alook at this link to the other thread. Tell me how many replies are posted then we will talk turkey.

http://forum.skyscraperpage.com/show...24368&page=502

Xeelee Jul 11, 2008 6:00 PM

So is it me or is this thing going to be mighty close to the freeway?


All times are GMT. The time now is 5:19 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.