Winnipeg | Wawanesa Insurance HQ | 92.2M | 23F
Wawanesa Insurance North American HQ
Location: 372 Graham Avenue and 236 Carlton Street, Winnipeg, MB Developer: True North Real Estate Development (TNRED) & The Wawanesa Insurance Architects: Architecture49 Contractor: PCL Constructors Inc Status: Under Construction Media: Wawanesa moving to new office tower at True North Square Documents: http://clkapps.winnipeg.ca/DMIS/View...ctionId=576525 Quote:
https://i.imgur.com/ZpMGxyM.jpg?2 https://i.imgur.com/JtHQ4vH.jpg?2 https://i.imgur.com/bULXv4m.png https://i.imgur.com/YrnZlxE.png?1 https://i.imgur.com/nvsfYXN.jpg https://i.imgur.com/gJFm5LF.jpg |
Thanks for making the thread, Wpg_Guy
I have to say I'm really excited about this building--I'm a fan of all the design elements from top to bottom. Here's the latest photo update from Winnipeg Grump Quote:
|
I take it that there haven't been any renderings released of the 23 storey version of the tower? Adding those few extra storeys will probably improve its proportions and do a lot for its overall appearance.
|
|
|
Thanks, Biff. That is going to be one hell of a block once it's all done.
|
Kind of like a big boy downtown.
|
I wish there will be a walkway connecting this and the Hydro building. I know they are just a few steps away but I think it will be nice to have these buildings connected especially during these cold days.
|
^They will be connected. At least at some point depending upon how Sutton Place goes.
Just need to take the skywalk back to City place then down through MTS Centre. Out of the way, yes. But will keep you warm on the cold days. |
Quote:
I definitely did that sort of thing at the UofM when I was there. I didn't want to bring my jacket to every class, so I went through the tunnels to get anywhere. But that is hilariously out of the way for how close they are. At least you don't have to go all the way around to the Bay I guess. |
I absolutely love this building.
Something similar on the lot at Notre Dame/Smith/Ellice would make me very, very happy :) |
Quote:
|
Thanks Biff for all the info, do you have an elevation that shows final building height
|
IIRC there was another image as part of their City Clerks hearing, where you could make out heights. But I think since then the height went up by 3 floors due to the ratios or whatever was going on there.
|
Quote:
|
Quote:
https://lh3.googleusercontent.com/pw...-no?authuser=0 |
Why were the plans for 300 Main shown here in feet and inches but this one is in metric? Or is the latter just for the purpose of getting approvals from the City?
Also curious as to how that diagram shows a 23 storey building... by my count it's 22 at the absolute maximum... what am I missing? These diagrams... so complicated... |
Imagine the floor plates cut in half, then double the height of the tower.
|
Any city in Canada would be proud to have this building downtown. A great addition to Winnipeg!
|
Quote:
|
All times are GMT. The time now is 12:35 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.