HOUSTON | The Travis (3300 Main) | 351 FT | 30 FLOORS
Developer: PM Realty Group
Architect: AECOM Design Type: Residential (336 units) Location: 3300 Main, Midtown Construction Timeline: 2017 Start Date - Completion https://farm6.staticflickr.com/5824/...47b94a6f_b.jpg Nov 2014 Article; soil testing occurred March 2015. http://www.houstonchronicle.com/news...5905207.php#/0 Quote:
https://farm6.staticflickr.com/5754/...733eddb7_b.jpg https://farm6.staticflickr.com/5621/...ba9cee06_b.jpg https://farm6.staticflickr.com/5635/...26c3ee5c_b.jpg Site: http://ww1.hdnux.com/photos/33/25/26...5/1000x920.jpg |
This one will be on the next planning commission agenda. Completion date set for January 2018.
|
Fencing has been placed around the site.
https://c2.staticflickr.com/6/5793/2...2c68fdbe_o.png https://c1.staticflickr.com/1/606/21...be27ede4_b.jpg |
http://blog.chron.com/primeproperty/...ntial-project/
Quote:
|
More of this in Midtown, please.
|
Revised design:
http://www.aecom.com/wp-content/uplo...13-894x531.jpg http://www.aecom.com/projects/3300-main-street/ Quote:
|
Asbestos-Laden Mod Code Enforcement Office Now Getting Swapped for Mixed Use Highrise on Main St.
Quote:
|
Proposed Case for: 2016-ASW-7018-OE
Quote:
Quote:
Quote:
|
http://vpegcapital.com/%E5%BD%93%E5%...5%AC%E5%AF%93/
Quote:
|
Demo underway now. :cheers:
|
These Are the Possible Tenants for New Midtown Mixed-Use
Quote:
|
|
|
|
|
|
Nice work.
|
|
|
|
All times are GMT. The time now is 2:06 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.