SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   City Compilations (https://skyscraperpage.com/forum/forumdisplay.php?f=87)
-   -   WINNIPEG | Projects and Development (https://skyscraperpage.com/forum/showthread.php?t=154386)

Cyro Feb 25, 2016 6:10 PM

Winnipeg | True North Square | ?M | ?M | ?M | ?M | 27F | 24F | 17F | 17F | Site Prep

Tower 1 (right) and 2 (left)
http://www.truenorthsquare.com/wp-co...ns_view_01.jpg
Image Source: http://www.truenorthsquare.com/development/gallery/

Quote:

Originally Posted by Cyro (Post 7347046)

Quote:

Originally Posted by Cyro (Post 7347121)

Tower 1

Number Of Floors: 17 (Podium levels 1-3)
Total Rentable (Tower): 296,776 sf
Total Rentable (Podium): 66,100 sf
Lobby Ceiling Height: 25'
Office Ceiling Height: 9’-6” typical clear ceiling height
Stairs designed to exceed code requirements
17th Floor Sky Garden

Con't more detail:
http://www.truenorthsquare.com/wp-co...ifications.pdf

Tower 3 and 4
http://storage.winnipegsun.com/v1/dy...y=80&size=650x
Image Source: http://www.winnipegsun.com/2016/02/2...quare-revealed

SSP Thread: http://forum.skyscraperpage.com/showthread.php?t=217327

cityguy Feb 26, 2016 2:37 AM

Great project.When will it be completed?

Cyro Feb 26, 2016 4:24 PM

Looks like a 4 year project by all accounts. Tower 1 @ 17 floors, U/C, should be completed in 2018. The other towers are projected to be finished in and around 2019-20, with the Sutton Place Residences,(condo tower) @ 17 flrs. as well the last to go up, of course pre-sales are always a consideration possibly pushing this all into 2020.

Cyro Apr 8, 2016 3:47 PM

Winnipeg | Proposed 40 Floor / ~ 153 Meter Residetial Tower
 
40-storey apartment tower planned for Portage and Main
Official announcement expected as early as next month

Quote:

Winnipeg-based Artis REIT is said to be in the late stages of planning a towering rental residence at the windy corner, right next door to the nearly four-decades-old 360 Main, which is the city’s third-tallest office building.

The $140-million project would not only include the construction of a 40-storey apartment tower, but the $35 million recladding of 360 Main, the 30-storey office tower formerly known as the Trizec Building, and owned by Artis, the real estate investment trust headed by CEO Armin Martens.
http://www.winnipegfreepress.com/loc...373789981.html

- Aprx: 400 Residential Units
- New Build 300 Main St.(Phase II) | Re-Clad 360 Main St.
- Cost: Aprx: $140M / Reclad $24M
- 3 Floors Commercial space/4 storey podium - Office/Retail
- Start: February 2017 | Completion 2019



April 7.2016 First Render Release:
http://www.metronews.ca/news/winnipe...nd-graham.html
I've edited the photo and scaled it to a smaller size.
Feel free to use it in other discussions and posts.
https://farm2.staticflickr.com/1644/...b6c0fd0b_z.jpg



Other Conceptual Renders From: Artis REIT

* Note: All images edited/hosted by me. Please add Artis link source
+ This note if using on site: Thx.
300 Main St.
https://farm2.staticflickr.com/1541/...27dac831_c.jpg
Looking South on Main St.
https://farm2.staticflickr.com/1595/...6b30c2e4_c.jpg
https://farm2.staticflickr.com/1588/...5b96b760_c.jpg
https://farm2.staticflickr.com/1531/...f3fa5994_c.jpg
Image Sources: http://www.artisreit.com/360-main-bu...-announcement/

Cyro May 26, 2016 5:29 PM

Winnipeg | 300 Assiniboine Ave | 86M | 25 Floors

Winding down on this residential project. A few excellent images of this building located on the banks of the Assiniboine River in Downtown Winnipeg.


Quote:

Originally Posted by EndoftheBeginning (Post 7414996)
Happened to be walking by today and thought I'd grab a quick photo of the three elevations visible along Assiniboine.

West elevation - not much glass

http://i.imgur.com/hcBu5zp.jpg

North elevation - even less glass

http://i.imgur.com/qLgWyR1.jpg

East elevation - almost all glass (looks better in morning sun, this was late afternoon)

http://i.imgur.com/T6iS3oT.jpg

SSP sub-forum thread:
http://forum.skyscraperpage.com/show...php?p=7415010&

Building Data Page:
http://skyscraperpage.com/cities/?buildingID=91433

Cyro May 28, 2016 9:58 PM

Winnipeg | Centrepoint | 70M - 72.5M | 21F | 20F

Winnipeg (2) tower project nearing completion.

The 20 storey Alt Hotel, completed late in 2015 (on the right), and the Glasshouse Skylofts condominium project wrapping up later this year.

https://pbs.twimg.com/media/CgH76ibUAAAvWbM.jpg
https://mobile.twitter.com/stefanogr...420417/photo/1

- http://www.urbancapital.ca/glasshouse-win

SSP Sub-Forum Thread:
http://forum.skyscraperpage.com/show...197745&page=98

Diagrams:

Alt Hotel
http://skyscraperpage.com/cities/?buildingID=96454

Glasshouse Skylofts
http://skyscraperpage.com/cities/?buildingID=29900

Cyro Jun 13, 2016 8:02 PM

Red River College STTC
Winnipeg, MB - Red River College Campus

Number TEN's: Prime Consultant
Size: 102,000 sq. ft.
Completed: 2017 (Estimated)

Quote:

New 102,000 sq. ft. Skilled Trades & Technology Centre addition at Red River College’s Notre Dame Campus...

The facility, scheduled for completion in 2017, will be a state-of-the art educational centre of excellence designed to accommodate up to 800 students each year in high-demand trades such as carpentry, sheet metal, electrical, refrigeration, machining and manufacturing and HVAC..

The project is targeting LEED® Gold status from the Canadian Green Building Council, incorporating durable, energy efficient design features to reduce energy requirements while minimizing waste...

http://www.numberten.com/modules/mod...0591b9c697.jpg

http://www.numberten.com/modules/mod...27e49c0ecf.jpg

Image/Informational Source:

Cyro Jun 13, 2016 8:19 PM

Winnipeg | Forks Redevelopment - Parcel 4 - Rail Side Initiative | Preliminary Proposals

Mixed-use redevelopment preliminary proposals. Located at the junctions of the Red and Assiniboine Rivers in downtown Winnipeg, Manitoba.
Initiative includes recreational, historical and cultural, residential, and institutional and supportive commercial uses.

Proposals Include:

- Public Spaces - Parks, Plazas, and Promenades
- Mixed-Use Development Parcels
- Community-Cultural Land Bank
- District Eco-Targets


http://www.theforks.com/uploads/ck/i...Concepts_2.jpg
http://www.theforks.com/uploads/ck/i...Concepts_3.jpg
http://www.theforks.com/uploads/ck/i...Concepts_1.jpg
http://www.theforks.com/railside/preliminary-concepts

More info at : http://www.theforks.com/

Revised concepts for Initiative(PDF)
http://s3.documentcloud.org/document...al-package.pdf

Project Thread:
http://forum.skyscraperpage.com/showthread.php?t=217747

Cyro Jun 15, 2016 2:31 PM

Macdonald Youth Services - Therapeutic Centre - U/C
175 Mayfair Ave, Wpg, MB.

Quote:

The state-of-the-art, 33,000-square-foot facility will replace three older buildings and centralize staff currently in six locations throughout Winnipeg.

One-third of the space will be devoted to therapeutic programs such as art, music and cultural activities, as well as individual and family counselling.

-Stuart Olson Construction.
-Completion June 2017.
Source


http://media.winnipegfreepress.com/i...ied-sept30.jpg
http://www.winnipegfreepress.com/our...329975881.html

Cyro Jun 16, 2016 3:45 PM

TNS Square Winnipeg

Base foundation for Crane 1 of 2 moving forward..

Quote:

Originally Posted by bomberjet (Post 7476221)

Project Thread:
http://forum.skyscraperpage.com/showthread.php?t=217327

Cyro Jun 17, 2016 4:34 PM

Manitoba Clinic - Winnipeg

Quote:

Originally Posted by Authentic_City (Post 7464627)

June.17.2016 ..Currently Reported as above grade..

Project thread:
http://forum.skyscraperpage.com/showthread.php?t=221635

LilZebra Jun 17, 2016 5:27 PM

^^^

I've been seeing an eye specialist since eary May.

There is a room on the main fl. where there is an eye clinic as well as a foot clinic.

I'm assuming that they're doing this because it's so crammed in space.

Cyro Jun 25, 2016 11:38 PM

Manitoba Museum of Man and Nature - Expansion Underway
Winnipeg, Manitoba


Quote:

Originally Posted by 1ajs (Post 7486119)

http://2.bp.blogspot.com/-HTFmv1QpO_...FIN-WEB-JS.jpg
http://3.bp.blogspot.com/-sg3dPjvTUc...23%2B10.37.jpg

Images/Informational Source:

kcexpress69 Jun 30, 2016 3:05 AM

http://2.bp.blogspot.com/-HTFmv1QpO_...FIN-WEB-JS.jpg
Arguably, the coolest looking building I've ever seen!!! :worship:

Cyro Jul 7, 2016 6:22 PM

Views of Centre Point Winnipeg at 20/21 floors and the completed adjacent parkade.

Quote:

Originally Posted by Authentic_City (Post 7495515)


Cyro Jul 7, 2016 6:25 PM

Manioba Clinic / 10 floors foundation complete and moving forward..


Quote:

Originally Posted by rkspec (Post 7495495)


Cyro Jul 7, 2016 6:56 PM

Fountain House Sherbrooke Ave - Winnipeg..West Braodway area..A winnipeg neighborhood growing and finally coming to life.after many years of decline..

West Broadway Area | Winnipeg | Development

Cyro Jul 7, 2016 7:03 PM

July.7.2016 True North Square Update: Winnipeg. 2nd crane base prep. underway top middle of photo)

https://c1.staticflickr.com/8/7347/2...9eb4cd28_c.jpg

Project Thread:
http://forum.skyscraperpage.com/forumdisplay.php?f=129

Cyro Jul 15, 2016 5:57 PM

d Condo 81m 24 floors - Progress

Project Thread:

http://forum.skyscraperpage.com/showthread.php?t=207408

Cyro Jul 20, 2016 8:20 PM

TNS project(centre of image)..Winnipeg, moving ever upward..

Quote:

Originally Posted by Wigglez (Post 7506694)



All times are GMT. The time now is 4:58 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.