the site was active yesterday when I walked by. the Howard (south) side:
https://farm1.staticflickr.com/760/2...d518d674_b.jpg and as seen from the north https://farm6.staticflickr.com/5776/...e38eedd6_b.jpg |
01/18/2016
Work continues. If you zoom in, it looks like rebar is being formed on site:
http://i.imgur.com/oDnOkvbh.jpg |
|
So is this under construction?
|
Quote:
|
I believe it is under construction tons of activity and digging and piling I believe when I passed by Sunday,
|
I should have grabbed pictures - the sidewalk along Beale St offers the best view, you can see everything.
There are caissons going in - I recognize the drills/equipment on-site and the site is littered with those cylindrical steel setups with the piping for cement running down them. It appears they are using the same construction method as at Salesforce Tower and 181 Fremont where they drill and fill the caissons first, and then excavate out the subterranean structure. In my opinion this is officially UC by SSP standards and I will try to grab pictures for evidence. |
I see rebar in the last picture, which is good enough for me to move to U/C.
Congrats guys, this is a nice tower :cheers: |
Quote:
|
some peeks over the fence
https://farm2.staticflickr.com/1477/...b243c122_b.jpg https://farm2.staticflickr.com/1717/...01cf8780_b.jpg and the Howard side https://farm2.staticflickr.com/1658/...e6d969ab_b.jpg |
|
Not sure how recent this is, but posted on Park Tower's instagram today:
https://instagram.fsnc1-1.fna.fbcdn....19678243_n.jpg |
03/22/16 - lots of concrete trucks going to and from the site at noon
|
Pouring a caisson.
I spoke with a worker - his estimate, likely as someone with little visibility and little reason to care too much, is that there is +6 months of this work, which looks like no work on the surface (literally), and then 6-8+ to dig, the it will take another long period to come out of the ground. Basically, no different from the other towers we became so naturally impatient with. |
|
Construction cam is up: http://oxblue.com/open/clarkconstruction/block5
|
Quote:
|
Quote:
|
Quote:
|
Concrete was being poured along the perimeter where the retaining walls will be, yesterday. I think we are getting close to excavation. Also, I think I noticed a new rendering on the fence. Can't wait for this tower to rise.
|
All times are GMT. The time now is 5:06 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.