NASHVILLE | JW Marriott | ??FT | 34 FLOORS
Miami area-based Turnery Associates debuts project for the United Methodist Publishing House site with a 35-story, 600 room JW Marriott and an adjacent roughly 22-story 400k sq ft spec office tower.
https://www.nashvillepost.com/news/2...for_sobro_site https://www.nashvillepost.com/sites/...25.56%20AM.png |
:previous: DAAAAAAAAAAAAMN!!! Good news overload.
Great happeningS in Nashville. :worship: |
Great news !:cheers:
|
Original groundbreaking was scheduled for 2016, they've moved this to as soon as summer 2015 and are refusing TIF funds, per reports because they don't need it. Bank financing I assume shouldn't be a problem because of the company and also the powerful market Nashville is right now with hotels and Class A office space at under 7% vacancy.
|
Man, Nashville is just getting all the cool buildings. I would definitely like to see the city in person when these get built. :cool:
|
Wow. That looks amazing.
|
I'm very impressed with this design; especially in comparison with some of the other hotel designs that we've gotten in Nashville in the past two or so years. Can't wait for next summer...so many towers under construction.
|
Quote:
|
Quote:
|
A larger image...
http://i.imgur.com/NP48uCk.jpg Appears to be 35-36 stories on top of a 4-5 story base. |
With the way the tops of both buildings just kind of fades out on the rendering, it makes me wonder if that's an actual design element, or if, perhaps, they're leaving the door open for the addition of more floors or a crown of some sort?
|
^Not sure.
Something else I just noticed is that the office tower appears to be built on top of a parking garage. |
Here's another rendering of this development. I really like both towers and cannot wait to watch them rise.
http://i.imgur.com/8D24FY1.jpg |
Thank you for posting that rendering! I was looking for it everywhere. This project looks awesome, though, in this rendering the hotel tower does appear to be a bit shorter than it initially did.
|
Quote:
|
Call me crazy, but imo, this is Nashville's best proposal EVER. This even blows the original Signature Tower design out of the water.
|
Quote:
|
Updated renders out
|
Building on site is now vacant and demo/asbestos removal will begin in earnest.
|
Existing structures on site are currently undergoing demolition for this project. Construction soon!
|