Status Changes
Just wanted to know how are drawings changed from proposal to construction?
YSL Residences in Toronto has been under construction for a couple of months now but is still listed as a proposal. https://i.imgur.com/93OhqNd.jpg https://urbantoronto.ca/forum/attach...0-jpeg.190477/ https://cdn.skyrisecities.com/images/l75f8d60WC.jpeg |
Right now it's in the Demolition phase, once that changes to Shoring/Excavation the status will change to U/C.
|
Quote:
|
All times are GMT. The time now is 9:03 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.