SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Cancelled Project Threads Archive (https://skyscraperpage.com/forum/forumdisplay.php?f=654)
-   -   TORONTO | 50 Bloor West | 230 M / 755 FT | 72 FLOORS | CANCELLED (https://skyscraperpage.com/forum/showthread.php?t=198669)

yaletown_fella Apr 8, 2012 12:27 AM

The preliminary massing study looks pretty lame. I think the best we can hope for is a spadrel-free zone.

caltrane74 Apr 10, 2012 3:07 AM

Yeah, pretty sure this one will be curtianwall glass. Very high end neighborhood.

caltrane74 Apr 11, 2012 4:54 PM

by koops in the database/Diagram section

http://skyscraperpage.com/cities/?buildingID=57390

koops65 Apr 11, 2012 6:36 PM

Don't put much faith in my drawing, because it's based on a crude, out of focus, black and white line drawing of one face of the building. Who knows what color the real thing will be? But it does give you an idea of the massing, the size, the height...

Gresto Apr 11, 2012 6:45 PM

Nice work regardless.

Davis137 Apr 11, 2012 7:54 PM

Wow, that is really tall...considering as all of you mentioned about Four Seasons looking so tall at different angles...

caltrane74 Apr 12, 2012 12:12 AM

One Bloor will hold its own well against this bad boy.

75 Floor One Bloor should hit 245 meters to 255 meters.

citizen j Apr 12, 2012 12:41 AM

Quote:

Originally Posted by caltrane74 (Post 5656898)
Another Google sketch by Marcanadian

Sears (Willis) Tower's younger brother?

caltrane74 Apr 12, 2012 9:42 AM

OWNERSHIP ON 50bloor.com


Reverse Whois: "Morguard Investments Ltd." owns about 11 other domains
Email Search: is associated with about 25 domains
Registrar
History:
1 registrar
IP History: 28 changes on 9 unique IP addresses over 7 years.
Whois History: 26 records have been archived since 2007-06-23 .
Reverse IP: 13,674 other sites hosted on this server.
Log In or Create a FREE account to start monitoring this domain name
Domain: 50bloor.com
Date Registered: 12/16/99
Date Modified: 11/25/09
Expiry Date: 12/16/12
DNS1: DNS.INTERNIC.CA
DNS2: DNS2.INTERNIC.CA
Registrant
Morguard Investments Ltd.
David Silva
One University Ave. Suite 1500
Toronto, ON (CA)
M5J 2N5
Administrative Contact
Morguard Investments Ltd.
David Silva
55 City Centre Drive Suite 800
Mississauga, ON (CA)
L5B 1M3
905 281 4847
905 281 5865
Technical Contact
Morguard Investments Ltd.
David Silva
55 City Centre Drive Suite 800
Mississauga, ON (CA)
L5B 1M3
905 281 4847
905 281 5865
Registrar: Namescou

LeftCoaster Apr 12, 2012 1:41 PM

Why are they calling it 50 Bloor west? Wouldn't an even number put it on the south side of the street?

caltrane74 Apr 12, 2012 2:19 PM

It is on the south side of the street. I thought you live there???

Edit: My bad. It's on the north side of the street. Brain Freeze.


One Bloor is on the South side of the street.

caltrane74 Apr 13, 2012 1:45 AM

The first element is creating an 8 storey commercial podium beginning at Mayfair Mews that extends along Bloor Street West

Renfrew store but adds four more storeys plus a rooftop garden on top of the flagship luxury department store. The 8 storey podium will be made up of retail space and offices.

The second element is building a 72 storey residential condominium tower plus 3 building service levels that sits on top of the 8 retail podium but does not extend over Holt

the

as

Renfrew

becomes part of the amenities for the condominium building. The condominium tower will be made up of approximately 600

Levels 11-38 will be the Garden Terrace Suites, followed by the City View Suites on floors 41-65 and topped off with the Sky-garden Penthouses on floors 68-80.

new address for the condominium building will be 30 Bloor Street West.

There are also plans for 6 level underground parking garage under the condominium tower at 30 Bloor Street West consisting of approximately 620 parking spaces for the condominium residents and commercial tenants.

30 Bloor Street West Amenities

Twenty four hour concierge Valet parking

Garden Terrace Levels 9 & 10 features:

Indoor lap pool and lounge Wellness spa Fitness centre with double height climbing wall Children's playroom Dining room with catering kitchen Party room Games room

Outdoor Rooftop Terrace features

Outdoor pool & sundeck Outdoor lounge with fireplace Outdoor dining area with barbeque Outdoor running track Roller blade oval Ice-skating rink Tennis court Outdoor children's and games area

City View Levels 39-40 features:

Landscaped terrace at level 39 Social rooms for condo residents Library Media lounge with music studio

Skygarden Levels 66 & 67 features

Landscaped terrace Sky lounge

caltrane74 Apr 13, 2012 10:30 PM

Quote:

Originally Posted by androiduk (Post 629488)
Surveyor in an alley off Cumberland. He's either there for this project or Cumberland Terrace.


for 30/50 Bloor???
http://urbantoronto.ca/forum/showthr...(-83s-)/page19

androiduk at UT

M II A II R II K Apr 13, 2012 10:32 PM

So this will be 50% taller than the Four Seasons that's right next to it.

Innsertnamehere Apr 14, 2012 2:08 AM

more like 37%.

Gresto Apr 14, 2012 2:47 AM

I get 32.36%

Travis007 Apr 14, 2012 5:42 PM

Too early to tell how this one will look based on one flat elevations drawing. But I'm glad that we're finally getting official movement on this site. Holt's and Cumberland Terrace are two of the city's most important pieces of redevelopment/intensification remaining, so let's get'er done.

M II A II R II K Apr 14, 2012 5:57 PM

So what becomes of Holt Renfrew? I guess they close.

Davis137 Apr 14, 2012 8:36 PM

On the diagrams page, this building is reffered to as the "Holt Renfrew" bldg....

Innsertnamehere Apr 14, 2012 10:19 PM

Quote:

Originally Posted by M II A II R II K (Post 5666416)
So what becomes of Holt Renfrew? I guess they close.

it says in the article (or rather something that a real estate agent blurbed) that caltrane was referencing that since the tower isn't actually built on top of the current holts, the holts will remain open until completion of the base directly below the tower, move over there, then the current holts will be torn down and rebuilt into the new podium. it will mean an interesting construction process!


All times are GMT. The time now is 12:47 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.