PDA

View Full Version : East Hamilton recreational Trail & Waterfront Link Pedestrian Bridge


LikeHamilton
Jun 15, 2009, 2:26 PM
Tender PW-09-244(BR) Available 5/7/2009 Closing 6/18/2009

East Hamilton recreational Trail & Waterfront Link Pedestrian Bridge

• The contract inlcudes a four span steel box girder structure approximately 200 m long over the QEW and Red Hill Creek with the main span consisting of a steel tied inclined arch. The scope of work includes bridge illumination, grading, granular base and
• hot mix paving
• Only those bidders that have submitted a T.R.F. in accordance with the Ontario Ministry of Transportation - Registry, Appraisal and Qualification System and qualified will be considered.
• The necessary rating in accordance with the Ministry of Transportation, Ontario Procedure is $8,000,000 in (S)
• NOTE: Payment of $100.00 non-refundable fee for each contract
• Addendum No. 1 issued on June 2, 2009.
• Prequalified Bidders are: Aecon Construction, Belor Construction, Brennan Paving & Construction, Dufferin Construction and Rankin Construction
• Addendum #2 issued June 3, 2009