Developers: • Capital Vertical Grupo Inmobiliario • Inmobiliaria Torre Chapultepec
Engineering: ARUP+DITEC
General Contractor: Fondo Hexa
Foundations Constructor: Cimesa
Concrete Structure: Lomcci, S.A. de C.V.
Engineering for lift-move-fix the old R483 House by: Vázquez Martínez Ingenieros (Vamisa)/Ale Heavy Lift
Other companies involved: Bovis Lend Lease / Protego / Ensesa S.A. de C.V./ Civita Edificios Verdes
Investment: 100US Million
Total site surface: 2,788 sq.meters
___________________________________________________________
After 5th re-design (245,260,244 and 246.6 meters the current total height).
USGBC LEED: Core & Shell