Like this building on Facebook
|
|  |
SV-Zentrale
| Status: | built | | Construction Dates | | Began | 2006 | | Finished | 2008 | | Floor Count | 28 | | Basement Floors | 3 | | Floor Area | 78,400 m² |
|  | | Building Uses | | - office | | Structural Types | | - highrise | | - atrium | | - lowrise | | Architectural Style | | - modern | | Materials | | - glass | | - steel | | - aluminium | | - concrete |
|
| | Heights | | Value | | Source / Comments | | | | Roof | | 337 ft | | | | | includes elevator shaft | | | | | Lower roof | | 328 ft | | | | | without elevator shaft | | |
Description The building was redesigned after the orignal plans of a 145m skyscraper have been cancelled due to a public referendum.
• Google Search
|
|
| | | | | |  Drawing by Jaic © SkyscraperPage.com |
|
Do you see any incorrect data on this page? Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).
Terms & Conditions All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions. No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc. All content © Copyright Skyscraper Source Media Inc. |
|
|
|