• Using the Parking Lot area of Shopping Eldorado near Pinheiros river, it is a Leadership in Energy and Environmental Design (LEED) Green Building connected to Shopping Eldorado by skybridge.
• Eight parking floors on this building, which four are below ground Tower and the rest at Parking Garage separate building above ground, in which each garage is for 32m² of office.
• 24 x 24 m helipad atop roof, possible to receiving helicopters up to 10 tons.
• Six of the elevators are one of the fastest in Brazil with speeds of 6 m/s.
• Ready for occupation on October 25, 2007.
___________________________________________________________
Do you see any incorrect data on this page? Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).