HomeDiagramsDatabaseMapsForumSkyscraper Posters

Switch heights to

Instituto do Câncer de São Paulo Octavio Frias de Oliveira

Av. Doutor Arnaldo 251 Cerqueira César BR-01246-000 Zona Oeste
Sao Paulo SP Brazil

Construction Dates
Floor Count25
Basement Floors4
Building Uses
 - hospital
Structural Types
 - highrise
 - landing pad
Architectural Style
 - postmodern
 - glass
 - steel
 - concrete, reinforced

 Heights ValueSource / Comments 
Roof410 ft

• Constructors: Andrade Gutierrez, Engeform, MHA Engenharia.

• Cost: R$ 270 millions. It has an annual cost of R$ 190 millions.

• Inaugurated on May 6, 2008, it was 3rd tallest hospital in the world when completed.
• 3 mechanical floors: Floors 9, 17 and 25.
• The building is cone shaped with wider base, 2.5 meters wider than its top.

Photo Links:
1- http://www.panoramio.com/photo/12691624
2- http://www.panoramio.com/photo/12691637
3- http://www.panoramio.com/photo/8972001
4- http://www.panoramio.com/photo/10394337
5- http://www.panoramio.com/photo/11707249

Google Search

Drawing by SkiesSensations
© SkyscraperPage.com

Aerial View / Map - Location within Sao Paulo

Sao Paulo Map Centered on BuildingFull Sao Paulo MapBuilding on Google Maps

Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).

Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.