HomeDiagramsDatabaseMapsForumAbout


515 Walnut

515 Walnut Street
Des Moines IA United States

Status:
proposed
Construction Dates
  Begin2023
  End2025
Floor Count33
Units / Rooms390
Building Uses
 - residential
 - retail
Structural Types
 - highrise

 Heights ValueSource / Comments 
Roof359 fthttps://urbandsm.com/des-moines-project-pages/des-moines/downtown/515-walnut
Switch heights to


Description
Architect: Neumann Monson Architects

Developer: St. Joseph Group

- Originally proposed as the Blackbird, the project was moved to its current location as the result of a land swap in 2018 and renamed.

- In 2022 the project was revived by the St. Joseph Group with demolition of the existing vacated Kaleidoscope at the Hub shopping mall to begin in April 2023 with construction of the high rise to begin shortly after. Completion of the $140 million residential building is expected in fall of 2025.


Google Search
  
 
See building
 

Drawing by Pyramid
© SkyscraperPage.com



Map Location - click to view full city map
Google Map



Do you see any incorrect data on this page?  Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).




Terms & Conditions
All content displayed on and contained within this page is subject to Skyscraper Source Media Inc.'s Terms and Conditions.  No content displayed on this page may be reproduced, in whole or in part, without prior written permission by Skyscraper Source Media Inc.  All content © Copyright Skyscraper Source Media Inc.